Manufacturing Edition: Bill of Materials and Routing
Create, maintain, and control master data definitions of products and processes with convenient one-screen maintenance access using the Bill of Material (BOM)/Routing module, part of the Acumatica Manufacturing Edition.
Improve Scheduling, Costing, and Material Planning with Accurate Bill of Material and Routing Standards
Inaccurate bill of material and routing definitions disrupt production schedules, creates cost variances, and wreak havoc on material plans.
Conversely, accurate and well-defined bill of materials improves production scheduling for maximized output and capacity utilization. Costs align to estimates and materials are available for production reducing costly rush orders and lost time waiting for parts to arrive.
Key Benefits of Acumatica Manufacturing BOM and Routing
Integrated Manufacturing BOM/Routing
Connect materials, work instructions and overhead costs to an operation to accommodate time-phased release of materials.
Multi-level BOM/Routing
Multiple levels of bills of material for both engineering and costed views of the entire product structure.
Multiple Costing Methods and Capabilities
Calculate costs at average, standard and actual cost. Add tooling costs and overhead costs, both fixed and variable.
Important Features of Acumatica BOM and Routing
- Control material planning and usage according to effectivity dates for phase-in and phase-out of content changes.
- Document the entire process using detailed work instructions and standard note capability for each process step.
- Define which work centers or machines to use, times for processing or setup, and other labor operation details.
Allows for components on Bills of Material to be displayed where they are used on a single-level or multi-level basis.
- Use phantom items to simplify structure maintenance for related groups of parts and materials to multiple products.
- When creating a planning bill of material, planning and production teams can “skip over” phantoms to plan and allocate components.
Relate BOM component parts to the drawing’s part numbers to avoid confusion and duplicate entry in the bill of material.
- Enables the support of multiple sites and have different or alternate BOM/Routing for each different location.
- Use flexible cost roll for a single-level or multi-level BOM, by item or site.
- Costs of the lower-level item will “roll” into the costs of the higher-level items.
- In a standard cost operation, costs will update the pending standard cost for each item in inventory.
Copy an existing BOM/routing to a different item as an alternate BOM/routing or for easy setup for a new, similar item.
- Allows for the replacement of a component with a different component on individual or all Bills of Material.
- Used to display optional or required values when reporting production.
- These are available on the bill of material header and/or operations and can be copied onto a Production Order when the order is created.
- Maintain a complete revision history of BOM/routing.
- Save and view multiple revisions – past, present, and future – as well as the reason for the revision.
- Define unlimited fixed and variable overhead costs by operation or work center.